MEAL dashboard for a flood intervention in Niger State
I built a MEAL dashboard to bring project activities, performance indicators, and beneficiary data together, making implementation easier to monitor and results easier to communicate.

01 — At a glance
| Project | Strengthening flood resilience in Nigeria to foster long-term societal stability – Focus on Niger State |
|---|---|
| Period | March 2026 – February 2027 |
| My role | Project focal point and member of the team that developed the project concept |
| What I built | A MEAL dashboard and integrated indicator-tracking system |
| Tools | Microsoft Excel |
| Application | Project monitoring, performance tracking, donor reporting and communications |
02 — The idea behind it
Much of my programme work has centred on science, technology and innovation (STI), including STEM education and technology-related initiatives. In these areas, finding ways to apply technology to practical challenges comes quite naturally. But I hadn't given as much thought to how I could bring my technical skills into other aspects of programme implementation.
That changed when I came across a colleague's work on a project she was working on. She had developed a dashboard to track the progress, results, and other useful data of her team's activities. I was impressed by how she had brought together different pieces of project information into a single tool, making implementation easier to monitor and results easier to communicate.
It was one of those moments when something seems obvious only after someone else has shown you what is possible. I had the technical background, the interest and, I realised, much of what was needed to build something similar. I just hadn't thought to apply them in that context.
When the Niger State flood resilience project began, I decided to give it a try. The concept was already developed, which I played a key part in, but I was determined to make the implementation much more efficient.
Good data doesn't just measure progress; it helps shape what comes next
03 — The challenge
On 28 May 2025, flooding caused by heavy rainfall submerged the market town of Mokwa in Niger State, Nigeria, causing severe damage. Officials said that the floods killed at least 500 people and confirmed that over 600 others were missing. At least 200 others were injured, and the flooding destroyed over 4,000 homes.
The project, "Strengthening flood resilience in Nigeria to foster long-term societal stability – Focus on Niger State," is in response to the flood disaster to assist the communities around in building resilience.
The project seeks to strengthen preparedness and resilience in flood-prone communities in Niger State, with a particular focus on Mokwa Local Government Area. It comprises eight activities across three outputs, targeting community engagement, beneficiary reach, women's and youth participation, institutional coordination, and technical capacity development.
The challenge in managing a project like this isn't simply knowing what needs to be achieved. It is maintaining an accurate, consolidated picture of progress as implementation unfolds.
Project information often sits across different sources: attendance sheets, activity reports, spreadsheets, and field updates. Figures recorded in one document may not always correspond with those in another, while tracking progress against multiple indicators can become increasingly cumbersome. As reporting deadlines approach, reconciling this information becomes a task in itself.
I wanted to create a system that would make this process more structured, reduce repetitive work, and provide a clearer picture of implementation at any point in the project lifecycle.
04 — What I built
What started as a personal tool for tracking implementation evolved into a structured MEAL workbook with five interconnected components:
- Project dashboard: A consolidated overview of progress across the project's three outputs, activity completion, and indicator performance against approved targets.
- Indicator tracker: A breakdown of every project indicator, including its target, actual achievement, percentage of target reached, status, and means of verification.
- Activity tracker: A record of all eight activities, capturing implementation status, delivery dates, supporting evidence, and corresponding budget lines.
- Participation database: A central record of event attendance, with beneficiary data disaggregated by gender, age, and disability and captured from individual attendance sheets.
- Notes and data flags: A running record of assumptions, data discrepancies and issues requiring verification, helping ensure that inconsistencies are identified and resolved before being carried into reports.
A key feature of the system is the integration between these components. Participation figures feed directly into the indicator tracker and dashboard, meaning information is entered once and reflected across the relevant sections. This reduces duplication and makes it easier to maintain consistency between monitoring records and reporting outputs.
05 — The impact
The dashboard has made three important contributions to project management and reporting.
- Better visibility of implementation progress - Project targets and actual achievements can be monitored continuously rather than revisited only when a report is due. Viewing indicators alongside one another also provides a more balanced understanding of performance. For instance, beneficiary reach may significantly exceed its target while other technical deliverables remain outstanding. The dashboard makes these differences visible, helping identify implementation gaps early enough for corrective action.
- More efficient reporting - Donors, management, and communications teams often require the same project information presented in different formats. Previously, preparing these updates meant returning to multiple documents, reconciling figures and recalculating progress. With the dashboard, the data used for routine monitoring also informs donor updates, periodic reports, and communications materials. Reporting therefore becomes more about interpreting and presenting available information than repeatedly compiling it.
- Improved data consistency and accountability - Every reported figure should be traceable to an underlying record. By linking indicator performance to source documentation and flagging discrepancies, the system provides an additional layer of data verification. It also creates a clearer record of how reported results are derived, strengthening the reliability of information used for management and donor reporting.
06 — A snapshot of implementation

As of 23 October 2026, the dashboard showed that five of the project's eight activities had been completed, with 65% of the implementation period elapsed.
The project had reached 3,093 people against an initial target of approximately 500, while women accounted for 61% of participants and young people aged 15–35 accounted for 59%. Two communities had been covered against the revised target of two.
The same dashboard also showed that several technical deliverables, including the investment note, CRIDA pilot, and nature-based solutions design, were yet to be completed.
This is where I find the dashboard particularly useful: it does not simply present achievements. It also makes unfinished work visible. Strong performance in one area should not obscure delays or gaps in another.
07 — What's next
This exercise has reinforced my interest in making monitoring, evaluation, accountability and learning an integral part of project design and implementation, rather than treating them primarily as reporting requirements.
I am particularly interested in exploring how relatively accessible digital tools can improve the way development programmes collect, organise, interpret and communicate information.
Not every project needs an elaborate dashboard. The right solution depends on the project's objectives, scale and information requirements. What matters is having a system that makes data useful: not just for documenting what has happened, but for understanding where things stand and informing what happens next.